April 2024 Production Times

National Silicone Sponge Sheet Packaging|National Silicone Sponge Sheet Packaging1
National Silicone Sponge Sheet Packaging|National Silicone Sponge Sheet Packaging1

This month, production times have remained constant, with the average period for order completion steady at 56.5 days.

Manufacturing sector conditions in China further improved in March, according to the latest PMI® data. Showing signs of stabilizing growth, this increase marks the fifth straight month of expansion in manufacturing activity due in large part to enhanced overseas demand. Factories also increased their purchases of raw material and boosted raw material inventories amid continued business optimism. These developments are a welcomed sign and indicate a potential improvement in manufacturing times ahead.

 

GCP Sourced Hose

Regarding our hose line, we have not released a production number due to the temporary unavailability of an accurate production schedule. If you intend to place an order for our hose line, please contact us to find out the appropriate lead times.

 

April Production Times

Our April 2023 production times measure the change in days an average order will take to produce from the time it is submitted (all facilities). This includes the time it takes to book a container, which currently stands at an average of 10.5 days. However, it excludes ocean shipping and other transit times. 

Approximate transit times (including estimated time the ship will wait at the port before it is unloaded) are:
East Coast: 35-45 days
West Coast: 20-30 days

If you have any concerns with your orders on hand or would like to discuss anything in more detail please do not hesitate to contact us for additional support.

 

April 2024 Production Times:
Premlene
– Sheet Rubber:  50-55 Days
– Eng. Structures: 55-60 Days
National Silicone
– Solid: 55-60 Days
– Sponge: 35-40 Days
– Foam: 45-50 Days
Rubatex
– Sponge: 65-70 Days
GCP Sourced
– Molded Parts: 65-70 Days
– Clamps/Fittings: 60-65  Days
– UHMW-PE Sheet: 60-65 Days
March 2024 Production Times:
Premlene
– Sheet Rubber:  50-55 Days
– Eng. Structures: 55-60 Days
National Silicone
– Solid: 55-60 Days
– Sponge: 35-40 Days
– Foam: 45-50 Days
Rubatex
– Sponge: 65-70 Days
GCP Sourced
– Molded Parts: 65-70 Days
– Clamps/Fittings: 60-65  Days
– UHMW-PE Sheet: 60-65 Days