There has been no change in production times from November to December. Premlene, National Silicone, GCP Clamps/Fittings, Conveyor Belt, Engineered Structures, Hose, UHMW-PE sheeting, and GCP Ceramic tile’s production times all stay the same.
December 2019 – Current Times
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 60-65 Days
National Silicone: 35-40 Days
GCP Ceramic Tile: 40-45 Days
GCP Conveyor Belt: 60-65 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 55-60 Days
GCP UHMW-PE Sheet: 65-70 Days
November 2019 – Last Month
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 60-65 Days
National Silicone: 35-40 Days
GCP Ceramic Tile: 40-45 Days
GCP Conveyor Belt: 60-65 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 55-60 Days
GCP UHMW-PE Sheet: 65-70 Days