December 2020 Production Times

Close up of a roll of black conveyor belting with no core - GCP Industrial Products
Close up of a roll of black conveyor belting with no core - GCP Industrial Products

Our December 2020 production times measure the change in days an average order will take to produce from time it is submitted, excluding ocean shipping and other transit times. Meaning, the lower the number the quicker we expect to produce.

The average expected production time for all GCP products in December is 55 days. Up 1 day from November.

As we reported last month when our National Silicone solid line increased by 20 days in October (since decrease by 15 in November) that we expected to work through the delay in a timely manor. As a result, we are pleased to inform you that a few of the production related issues we were experiencing up stream have been resolved.

If you have any concerns with your orders on hand please contact us for additional support.  

 

December 2020 Production Times: 
Premlene Sheet Rubber: 50-55 Days
Premlene Eng. Structures: 60-65 Days
National Silicone Solid: 45-50 Days
National Silicone Sponge: 35-40 Days
GCP Hose: 55-60 Days
GCP Clamps/Fittings: 65-70 Days
GCP UHMW-PE Sheet: 60-65 Days
 
Nov. 2020 Production Times:
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 50-55 Days
National Silicone Solid: 60-65 Days
National Silicone Sponge: 30-35 Days
GCP Hose: 55-60 Days
GCP Clamps/Fittings: 65-70 Days
GCP UHMW-PE Sheet: 60-65 Days
SHARE THIS

This website uses cookies to ensure you get the best experience. By continuing to browse on this website, you accept the use of cookies for the above purposes.