Overall very positive news regarding our updated production times. Due to some pre-orders earlier in the year we’ve seen production times drop for Premlene, National Silicone, and Ceramic Tiles. No change in production times for Belting & Engineered Structures, Hose, and Clamps/Fittings. While UHMW-PE sheeting was the only material to increase days for production over the month.
June 2019 – Current Times
Premlene Sheet Rubber: 35-40 Days
National Silicone: 35-40 Day
Enlast Ceramic Tile: 35-40 Days
Enlast Conveyor Belt: 60-65 Days
Enlast Eng. Structures: 60-65 Day
Alpheus Hose: 50-55 Days
Surloc Clamps/Fittings: 50-55 Days
GCP UHMW-PE Sheet: 70-75 Days
Rubatex Sponge:
Times Currently Unavailable
May 2019 – Last Month
Premlene Sheet Rubber: 45-50 Days
National Silicone: 45-50 Day
Enlast Ceramic Tile: 55-60 Days
Enlast Conveyor Belt: 60-65 Days
Enlast Eng. Structures: 60-65 Days
Alpheus Hose: 50-55 Days
Surloc Clamps/Fittings: 50-55 Days
GCP UHMW-PE Sheet: 60-65 Days
Rubatex Sponge:
Times Currently Unavailable
Sincerely,
The GCP Team