November 2019 Production Notes

A black piece of closed cell Rubatex R4261 sponge rubber being skived - GCP Industrial Products
A black piece of closed cell Rubatex R4261 sponge rubber being skived - GCP Industrial Products

The November production times have continued to stay positive. GCP Ceramic Tile is the only product that shows an increase in manufacturing times. As for Premlene, National Silicone, GCP Clamps/Fittings, Conveyor Belt, Engineered Structures, Hose, and UHMW-PE sheeting, the production times stay the same. 

November 2019 – Current Times

Premlene Sheet Rubber: 40-45 Days

Premlene Eng. Structures: 60-65 Days

National Silicone: 35-40 Days

GCP Ceramic Tile: 40-45 Days

GCP Conveyor Belt: 60-65 Days

GCP Hose: 50-55 Days

GCP Clamps/Fittings: 55-60 Days

GCP UHMW-PE Sheet: 65-70 Days

Rubatex Sponge:
Times Currently Unavailable

October 2019 – Last Month

Premlene Sheet Rubber: 40-45 Days

Premlene Eng. Structures: 60-65 Day

National Silicone: 30-35 Day

GCP Ceramic Tile: 35-40 Days

GCP Conveyor Belt: 60-65 Days

GCP Hose: 50-55 Days

GCP Clamps/Fittings: 55-65 Days

GCP UHMW-PE Sheet: 65-70 Days

Rubatex Sponge:
Times Currently Unavailable