The November production times have continued to stay positive. GCP Ceramic Tile is the only product that shows an increase in manufacturing times. As for Premlene, National Silicone, GCP Clamps/Fittings, Conveyor Belt, Engineered Structures, Hose, and UHMW-PE sheeting, the production times stay the same.
November 2019 – Current Times
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 60-65 Days
National Silicone: 35-40 Days
GCP Ceramic Tile: 40-45 Days
GCP Conveyor Belt: 60-65 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 55-60 Days
GCP UHMW-PE Sheet: 65-70 Days
Rubatex Sponge:
Times Currently Unavailable
October 2019 – Last Month
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 60-65 Day
National Silicone: 30-35 Day
GCP Ceramic Tile: 35-40 Days
GCP Conveyor Belt: 60-65 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 55-65 Days
GCP UHMW-PE Sheet: 65-70 Days
Rubatex Sponge:
Times Currently Unavailable