October’s production numbers show a slight increase of times for GCP Clamps/Fittings and National Silicone Solid. Premlene Eng. Structures production times decrease by 5 days, while Premlene Sheet Rubber, National Silicone Sponge, GCP Hose, and GCP UHMW-PE Sheet continue to stay the same.
October 2020 – Current Times
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 50-55 Days
National Silicone Solid: 40-45 Days
National Silicone Sponge: 25-30 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 65-70 Days
GCP UHMW-PE Sheet: 60-65 Days
September 2020 – Last Month
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 55-60 Days
National Silicone Solid: 35-40 Days
National Silicone Sponge: 25-30 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 55-60 Days
GCP UHMW-PE Sheet: 60-65 Days