September’s production times continue to stay positive and consistent. Premlene Sheet Rubber and National Silicone Sponge are the only two materials that show a slight increase in times. Premlene Eng. Structures, National Silicone Solid, GCP Hose, GCP Clamps/Fittings, and GCP UHMW-PE Sheet continue to stay the same.
September 2020 – Current Times
Premlene Sheet Rubber: 40-45 Days
Premlene Eng. Structures: 55-60 Days
National Silicone Solid: 35-40 Days
National Silicone Sponge: 25-30 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 55-60 Days
GCP UHMW-PE Sheet: 60-65 Days
August 2020 – Last Month
Premlene Sheet Rubber: 35-40 Days
Premlene Eng. Structures: 55-60 Days
National Silicone Solid: 35-40 Days
National Silicone Sponge: 20-25 Days
GCP Hose: 50-55 Days
GCP Clamps/Fittings: 55-60 Days
GCP UHMW-PE Sheet: 60-65 Days