December 2019 Production Notes

Close up of a roll of black conveyor belting with no core - GCP Industrial Products

December 2019 Production Notes

There has been no change in production times from November to December. Premlene, National Silicone, GCP Clamps/Fittings, Conveyor Belt, Engineered Structures, Hose, UHMW-PE sheeting, and GCP Ceramic tile’s production times all stay the same. 

December 2019 – Current Times

Premlene Sheet Rubber: 40-45 Days

Premlene Eng. Structures: 60-65 Days

National Silicone: 35-40 Days

GCP Ceramic Tile: 40-45 Days

GCP Conveyor Belt: 60-65 Days

GCP Hose: 50-55 Days

GCP Clamps/Fittings: 55-60 Days

GCP UHMW-PE Sheet: 65-70 Days

November 2019 – Last Month

Premlene Sheet Rubber: 40-45 Days

Premlene Eng. Structures: 60-65 Days

National Silicone: 35-40 Days

GCP Ceramic Tile: 40-45 Days

GCP Conveyor Belt: 60-65 Days

GCP Hose: 50-55 Days

GCP Clamps/Fittings: 55-60 Days

GCP UHMW-PE Sheet: 65-70 Days