June 2019 Production Times

Rubber production facility using green rotocure machines - GCP Industrial Products

June 2019 Production Times

Overall very positive news regarding our updated production times. Due to some pre-orders earlier in the year we’ve seen production times drop for Premlene, National Silicone, and Ceramic Tiles. No change in production times for Belting & Engineered Structures, Hose, and Clamps/Fittings. While UHMW-PE sheeting was the only material to increase days for production over the month.

June 2019 – Current Times

Premlene Sheet Rubber: 35-40 Days

National Silicone: 35-40 Day

Enlast Ceramic Tile: 35-40 Days

Enlast Conveyor Belt: 60-65 Days

Enlast Eng. Structures: 60-65 Day

Alpheus Hose: 50-55 Days

Surloc Clamps/Fittings: 50-55 Days

GCP UHMW-PE Sheet: 70-75 Days

Rubatex Sponge:
Times Currently Unavailable

May 2019 – Last Month

Premlene Sheet Rubber: 45-50 Days

National Silicone: 45-50 Day

Enlast Ceramic Tile: 55-60 Days

Enlast Conveyor Belt: 60-65 Days

Enlast Eng. Structures: 60-65 Days

Alpheus Hose: 50-55 Days

Surloc Clamps/Fittings: 50-55 Days

GCP UHMW-PE Sheet: 60-65 Days

Rubatex Sponge:
Times Currently Unavailable

Sincerely,
The GCP Team